Gembrook Transfer Main

Pipeline constructed on Belgrave Gembrook Road which was a high traffic, 80km/hr speed limited and self managed and Vicroads approved TMP

Client
Yarra Valley Water

Contract Value $1.2 Million

Length of gravity Main 3,128 metres of DN 225 PE

Maintenance Structures 15 maintenance structures up to 7m in depth

Technique used H.D.D. (3,000m) & Open-Cut (128m)

Machinery used Vermeer 24x40A, Komatsu PC75, JD 315SE, Butt Weld jointing method, Vacuum Loader